Capacity Market Search

Showing components with technology: Storage (Duration 2h)

Displaying items 651 - 700 of 1060 matching components (Page 14 of 22)

Component Results (1060)

Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV RUBIN LIMITED CMU: ME2024 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 10.86 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Pikevy Farm, Glenrothes, Fife, KY6 3HD

This is a 49.9MW battery storage facility connected at 33kV.

PITKEVEY BATTERY STORAGE LIMITED CMU: PITK25 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.82 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW

A standalone 0.949MW BESS connected directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP001 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Guilsborough Lodge Farm, West Haddon Road, Guilsborough, Northampton, NN6 8QE

A standalone 0.949MW Battery Energy Storage System connected directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP001 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA

A standalone 0.949MW BESS connected directly to the DNO network

GRIDSOURCE LIMITED CMU: POP002 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR

A standalone 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP002 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP

A 2 hour BESS connected directly to the DNO network

GRIDSOURCE LIMITED CMU: POP003 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA

A standalone 2 hour BESS connecting directly onto the DNO network.

GRIDSOURCE LIMITED CMU: POP003 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP004 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP004 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA

A 2 hour BESS connected directly to the DNO network

GRIDSOURCE LIMITED CMU: POP005 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land To The North Of Folly Road, Deanshanger, MK19 6EY

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED CMU: POP005 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB24 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 13.07 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPIQ24 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.47 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Royle Barn Road, Rochdale, OL11 3DX

Battery Energy Storage Site

ADV 003 LIMITED CMU: RB252H Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.50 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS

New Build Battery Storage Facility

SWANGATE ENERGY STORAGE LIMITED CMU: SWAN25 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.54 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land to the south of National Grid's Rainhill substation, Lea Green Road, Rainhill WA9 4QD

Battery project on greenfield site

SIZING JOHN LIMITED CMU: VAR010 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.48 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

SAMBAR POWER LIMITED CMU: VAR011 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.90 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE.

Lithium-based battery energy storage system.

WALPOLE GREEN LIMITED CMU: WALPO2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.48 MW 2025-26 (T-1) One Year Ahead Capacity Auction
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB

A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.

GRIDSOURCE (WOBURN RD) LIMITED CMU: WBN006 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.26 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Welkin Road, Bredbury, SK6 2BH

Battery Energy Storage System

AVE 002 LIMITED CMU: WR252H Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.43 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX

A Battery Energy Storage System

HB825AXM LTD CMU: AXM025 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX

A Battery Energy Storage System

ETP-QQR ENERGY LIMITED CMU: BEES25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US0002 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US0018 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB

Battery storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2B1 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US0021 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ

New build battery storage.

UK BATTERY STORAGE LTD CMU: BRAD25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point)

The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar …

FP LUX SCURF DYKE SOLAR LIMITED CMU: SCU003 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.60 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US0053 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU.

Battery Storage Plant

WEST DIDSBURY STORAGE LIMITED CMU: Didsb1 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Mill Hill Farm, Hazel Grove, SK12 1EG

A Battery Energy Storage System

ETP-QQR ENERGY LIMITED CMU: BRAM25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA

A Battery Energy Storage System.

HD144WHI LTD CMU: WHI025 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Haigh Park Road, Stourton, Rothwell, Leeds, West Yorkshire. LS10 1RT

A Battery Energy Storage System

WESSEX ENERGY STORAGE LTD CMU: WES003 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB

A Battery Energy Storage System

WESSEX ENERGY STORAGE LTD CMU: WES001 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ

A New Build Battery Energy Storage System

HD888CAP LIMITED CMU: CAPN25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Titchfield Lane, Wickham, Fareham PO15 6DY

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

BOTLEY ENERGY RESERVE LIMITED CMU: SHESS1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 13.55 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU

A Battery Energy Storage System

ETP-QQR ENERGY LIMITED CMU: CART25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-leHope, SS17 9LL

A Battery Energy Storage System

CORPOWER LIMITED CMU: CBT21C Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

RWE GENERATION UK PLC CMU: CHES21 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP

A Battery Energy Storage System

ETP-QQR ENERGY LIMITED CMU: CHNL25 Storage (Duration 2h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction