Displaying items 801 - 850 of 1060 matching components (Page 17 of 22)
9 x 2.222MW/4.874MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY.
Existing CMU comprising of battery storage and associated plant
Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Existing CMU comprising of battery storage and associated plant
Existing CMU comprising of battery storage and associated plant
30MW/30MWh one hour battery
BESS project to be installed within a future Greener Grid Park.
30MW/30MWh one hour battery
Standalone Battery Storage Asset
CMU ID 24WHI1, a new build battery storage CMU
This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via …
New build 49.995MW / 99.990 MWh battery energy storage system.
New build generating CMU component known as Dengie BESS
New Build CMU comprising of battery storage and associated plant
Existing CMU comprising of battery storage and associated plant
New Build CMU comprising of battery storage and associated plant
New Build Battery Storage
Standalone battery storage system connecting at 33kV to the East Killbride substation
Battery Storage
Lithium-based battery energy storage system
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
Recently-commissioned, existing Li-Ion BESS, 2hr duration.
New build battery storage
30MW/30MWh one hour battery
Battery Storage Plant
29.9MW/29.9MWh one hour battery
Battery storage plant
New Build 2 hour battery storage system.
Battery storage plant
Existing CMU comprising of battery storage and associated plant
New Build CMU comprising of battery storage and associated plant
New Build CMU comprising of battery storage and associated plant
New Build CMU comprising of battery storage and associated plant
Existing CMU comprising of battery storage and associated plant
A New Build Battery Energy Storage System
New build generating CMU component - Whaddon Farm BESS
New build battery storage.
Battery storage plant
Existing generating battery storage unit.
This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via …
New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.
Battery Storage 2 hour duration
Brigg Battery 2 hour duration
CMU ID 23NEW1, a new build battery storage CMU
New build battery storage CMU with CMU ID 23AUC1
Lithium-ion Battery Energy Storage System
Existing CMU comprising of battery storage and associated plant
Existing CMU comprising of battery storage and associated plant
49.5MW Battery Energy Storage facility
49.5MW Battery Energy Storage facility