Capacity Market Search

Showing components with technology: Storage (Duration 2h)

Displaying items 851 - 900 of 1060 matching components (Page 18 of 22)

Component Results (1060)

LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU.

Battery Storage Plant

WEST DIDSBURY STORAGE LIMITED CMU: Didsb1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Clay Tye Road, Upminister, RM14 3PL

49.5MW Battery Energy Storage facility connected to 132kv network

HARMONY CTF 2 LIMITED CMU: CTF220 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH

Battery storage plant

ARBROATH LIMITED CMU: AR1H35 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB

A 49.5MW battery energy storage system

HARMONY (PW) LIMITED CMU: PILL21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW

A new build 30MW battery energy storage system

HARMONY JF LIMITED CMU: JFIE21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW

A new build 30MW battery energy storage system

HARMONY JF LIMITED CMU: JFIE21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU

A new build 20MW battery energy storage system

HARMONY FM LIMITED CMU: FARN21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL

A new build 49.5MW battery energy storage system

HARMONY CTF LIMITED CMU: CLAY21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE

A new build 49.5MW battery energy storage system

HEIT BF LIMITED CMU: BUMP21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU

A new build 11MW battery storage system

HARMONY BD LIMITED CMU: BROA21 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ

49.5 MW Battery Energy Storage facility

HARMONY CF LIMITED CMU: CHAP22 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land at Sterte Avenue West, Poole, BH15 2AL

A 7.5MW Tesla Battery Energy Storage System

HARMONY HB LIMITED CMU: HHBL20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA

A new build 34MW battery energy storage system

HARMONY CS LIMITED CMU: CONT20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ

The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, …

DEVCO 2017 LIMITED CMU: AMB020 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Waterswallows Energy Limited CMU: WATERS Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Buxton Power Limited CMU: BUXTON Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Buxton Power Limited CMU: BUXTON Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU.

Battery Storage Plant

WEST DIDSBURY STORAGE LIMITED CMU: Didsb1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US9018 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US9017 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US9006 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US9002 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US9001 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland

A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable …

VATTENFALL WIND POWER LTD CMU: URB-02 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
132 Manchester Road, Carrington, Manchester, M31 4AY

50MW capacity system with 100MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site

WAINSTONES ENERGY LIMITED CMU: TRAFB1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Mannington Depot, Telford Way, Swindon, SN5 8BA

A Battery Energy Storage System

SW MANNINGTON LIMITED CMU: SWM024 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA

A Battery Energy Storage System.

SW MANNINGTON LIMITED CMU: SWM024 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
West Marsh Road Spalding Lincolnshire PE11 3BB

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is …

SPALDING ENERGY PARK LIMITED CMU: SPBD20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
West Marsh Road Spalding Lincolnshire PE11 3BB

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is …

SPALDING ENERGY PARK LIMITED CMU: SPBC20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
West Marsh Road Spalding Lincolnshire PE11 3BB

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is …

SPALDING ENERGY PARK LIMITED CMU: SPBB20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
West Marsh Road Spalding Lincolnshire PE11 3BB

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is …

SPALDING ENERGY PARK LIMITED CMU: SPBA20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPCV20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBS20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land adjacent to Salisbury Substation, Salisbury, SP2 0BL

49.5MW Battery Energy Storage System

SSE BATTERY SALISBURY LIMITED CMU: HSWL20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBF20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction