Capacity Market Search

Showing components with technology: Storage (Duration 2h)

Displaying items 901 - 950 of 1060 matching components (Page 19 of 22)

Component Results (1060)

The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBE20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBD20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBC20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBB20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBA20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-le-Hope, Essex SS17 9LP

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …

GATEWAY ENERGY CENTRE LIMITED CMU: GEBG20 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD

A Battery Energy Storage System.

ENDERBY BATTERY STORAGE LIMITED CMU: ENDE24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP

A transmission connected battery storage unit

CLEVE HILL SOLAR PARK LIMITED CMU: CHS24C Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP

A transmission connected battery storage unit

CLEVE HILL SOLAR PARK LIMITED CMU: CHS24B Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Stonehill, Charlton, Malmesbury, SN16 9RP

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

STONEHILL ENERGY STORAGE LIMITED CMU: BAT050 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX

A Battery Energy Storage System.

HB411MIN LTD CMU: AXM024 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

FLEXION ENERGY HOLDINGS UK LTD CMU: iV018D Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA

A Battery Energy Storage System.

HD144WHI LTD CMU: WHIT24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land on the South Side of Fairy Lane, Sale, M33 2JU

Battery Storage Plant

WEST DIDSBURY STORAGE LIMITED CMU: WD2024 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE

Lithium-based battery energy storage system.

WARLEY GREEN LIMITED CMU: WARLE1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE.

Lithium-based battery energy storage system.

WALPOLE GREEN LIMITED CMU: WALPO1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland

A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable …

VATTENFALL WIND POWER LTD CMU: URB-04 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV ANNING LIMITED CMU: TL2023 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 …

SG GRI TILN BESS LIMITED CMU: TILN01 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD.

Lithium-based battery energy storage system

SUNDON GREEN LIMITED CMU: SUNDO1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Wellington Street, Oldham, Lancashire OL4 1SA

Energy facility comprising of battery energy storage sets and ancillary equipment.

HAMILTON LANE POWER LIMITED CMU: STOR15 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Lowfields Way, Lowfields Business Park, HX5 9DA

BATTERY STORAGE PLANT

GREENGRIDPOWER1 LTD CMU: SHIL24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Titchfield Lane, Wickham, Fareham PO15 6DY

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

BOTLEY ENERGY RESERVE LIMITED CMU: SHESS1 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point)

The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar …

FP LUX SCURF DYKE SOLAR LIMITED CMU: SCU003 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF

CMU to comprise multiple individual storage units metered and despatched centrally

Sembcorp Utilities (UK) Limited CMU: S27BS3 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET

This is a 49.99MW battery storage facility connected at 33kV.

ROARING HILL ENERGY STORAGE LTD CMU: RHT124 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom

The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.

SSE BATTERY SALISBURY LIMITED CMU: SAL241 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

DAMSONGREEN ENERGYFARM LIMITED CMU: PPBF23 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW

A Battery Energy Storage System.

HD143OCK LTD CMU: OCKH24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF

49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.

Zenobe Wishaw Limited CMU: NBWSH3 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW

12MW 24MWh battery storage located at Brindley Close in Swindon

Zenobe Brindley Limited CMU: NBBND3 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK3 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK3 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
35-37 Sheffield Road, Newton, Hyde, SK14 2PU

New Build 2 Hour Battery Storage Plant.

PULSE CLEAN ENERGY SPV BELL LIMITED CMU: HY2023 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX

New Build Battery Energy Storage system

HEIT WG LIMITED CMU: HWGL24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Little Raith Farm, Auchtertool, Fife, KY5 0AX

Battery Energy Storage facility

HEIT LR LIMITED CMU: HLRL24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW

A new build 19MW battery energy storage system

HARMONY JF LIMITED CMU: HJF241 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY

New build two-hour duration storage to replace diesel plant

PULSE CLEAN ENERGY UK LIMITED CMU: HI2023 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR

A Lithium Ion Energy Storage System

HEIT HP LIMITED CMU: HHPL24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP,

This is a 20MW battery storage facility connected at 33kV.

HAWKERS HILL ENERGY PARK LIMITED CMU: HHEP24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ

49.5 MW Battery Energy Storage facility

HARMONY CF LIMITED CMU: HCFL24 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE

A new build battery energy storage system

HEIT BF LIMITED CMU: HBF224 Storage (Duration 2h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction