Capacity Market Search

Showing components with technology: Storage (Duration 2h)

Displaying items 401 - 450 of 1060 matching components (Page 9 of 22)

Component Results (1060)

Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point)

The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar …

FP LUX SCURF DYKE SOLAR LIMITED CMU: SCU003 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV ANNING LIMITED CMU: TL2023 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.00 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Aikengall 2a Wind Farm Innerwick EH42 1SG

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

AIK2A SUSTAINABLE ENERGY LTD CMU: AK2a03 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 6.70 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Titchfield Lane, Wickham, Fareham PO15 6DY

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

BOTLEY ENERGY RESERVE LIMITED CMU: SHESS1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.68 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Plot C, Land at Severn Road Avonmouth BS10 7SE

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Willington Power Limited CMU: WILL_C Storage (Duration 2h) CMU De-Rated N/A CMU DB: 10.77 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB

A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.

GRIDSOURCE (WOBURN RD) LIMITED CMU: WBN004 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.20 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.15 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR.

New build generating CMU component - Whaddon Farm BESS

BRITISH SOLAR RENEWABLES LIMITED CMU: BSR004 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.23 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX

A Battery Energy Storage System

HB825AXM LTD CMU: AXM027 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.68 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS

Battery Storage

JBM SOLAR PROJECTS 17 LTD CMU: CLAD23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.92 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.31 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU

Battery energy storage unit

FRP MERCIA HOLDCO LIMITED CMU: F1PB23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.21 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

FLEXION ENERGY HOLDINGS UK LTD CMU: iV014B Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY

New Build Battery Energy Storage system

KEADBY GENERATION LIMITED CMU: KEADBY Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.31 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land Near To Monks House, Westerleigh, BS37 8RD

BESS with Lit-Ion technology, 2 hours duration

RENBAT 6 LIMITED CMU: Wstrl2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.30 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.54 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Widow Hill, Balderstone Lane, Burnley, BB10 2TA

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

P3P ENERGY MANAGEMENT LIMITED CMU: WIDW23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 10.77 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land North of Melksham Substation, Wiltshire, Melksham, SN15 2LU

Battery Storage

JBM SOLAR PROJECTS 13 LIMITED CMU: WICK23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.61 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land Near To Monks House, Westerleigh, BS37 8RD

BESS with Lit-Ion technology, 2 hours duration

RENBAT 6 LIMITED CMU: Wstrl1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.30 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.54 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: TMB002 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 43.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: TMB003 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 43.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 …

SG GRI TILN BESS LIMITED CMU: TILN02 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: TMB005 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 43.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Hele Road, Hele, Taunton, Somerset TA4 1AH

Energy facility comprising of battery energy storage sets and ancillary equipment.

STOR 107 LTD CMU: STOR07 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.08 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA

Energy facility comprising of battery energy storage sets and ancillary equipment.

STOR 136 LTD CMU: STOR36 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.38 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
London Road, Holyhead, Isle of Anglesey, Wales, LL65 2TJ, United Kingdom

2 hour 210 MW battery Storage new build

ANGLESEY LAND HOLDINGS LIMITED CMU: AngPen Storage (Duration 2h) CMU De-Rated N/A CMU DB: 32.32 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU

Energy facility comprising of battery energy storage sets and ancillary equipment.

STOR 149 LTD CMU: STOR49 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.38 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Home Farm, Front Street, Hart, Hartlepool, TS27 3BL

Battery Storage Plant

WORCESTERSHIRE SOLAR 1 LIMITED CMU: WORC27 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.08 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.54 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom

New build 49.995MW / 99.990 MWh battery energy storage system.

AGR SOLAR 2 LIMITED CMU: BFEN23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.62 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW.

Battery Storage Plant

GRENDON LAKES STORAGE LIMITED CMU: SEL133 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT

New Build Battery Storage

ALCEMI STORAGE DEVELOPMENTS 4 LIMITED CMU: COA127 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 46.17 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: F2DR23 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.31 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH.

A Battery Energy Storage System.

KXP WINTERTON LIMITED CMU: SCUN27 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.62 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF

Battery Storage Plant

EXETER STORAGE LIMITED CMU: SEL139 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 44.63 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Malton Road, Malton YO17 8JF

A 40MW new build of battery storage unit.

CBS ENERGY STORAGE ASSETS UK LIMITED CMU: 9RES06 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 6.16 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

CSE25 Limited CMU: ACSE25 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 22.93 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL

Battery Storage Plant

EAST CLAYDON STORAGE LIMITED CMU: SEL140 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 76.95 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.77 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.54 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
GCC Cathkin, Cairnmuir Road, Glasgow, G74 4GY

60MW / 120MWh

BLUESTONE ENERGY LTD CMU: CATH01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Gladstone St, Blackburn, BB1 3ES

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDBKB1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.84 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Armshead Farm, Armshead Road, Werrington, ST9 0NB

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDCEL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Bristol Avenue, Blackpool, FY2 0JF

New Build CMU comprising of battery storage and associated plant

CONRAD (BLACKPOOL) LIMITED CMU: CDBLK3 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.55 MW 2026-27 (T-4) Four Year Ahead Capacity Auction