Displaying items 401 - 450 of 1060 matching components (Page 9 of 22)
The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar …
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Battery energy storage unit
New build generating CMU component - Whaddon Farm BESS
A Battery Energy Storage System
Battery Storage
Battery energy storage unit
Battery energy storage unit
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
New Build Battery Energy Storage system
BESS with Lit-Ion technology, 2 hours duration
Battery energy storage unit
70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.
Two duration battery storage
Battery Storage
BESS with Lit-Ion technology, 2 hours duration
Battery storage unit
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
2 hour Battery Energy Storage System
Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 …
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Energy facility comprising of battery energy storage sets and ancillary equipment.
Energy facility comprising of battery energy storage sets and ancillary equipment.
2 hour 210 MW battery Storage new build
Energy facility comprising of battery energy storage sets and ancillary equipment.
Battery Storage Plant
Battery energy storage unit
Battery Storage Plant
Battery Storage Plant
New build 49.995MW / 99.990 MWh battery energy storage system.
Battery Storage Plant
Battery Storage Plant
New Build Battery Storage
Battery energy storage unit
A Battery Energy Storage System.
Battery Storage Plant
A 40MW new build of battery storage unit.
The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.
Battery Storage Plant
Battery energy storage unit
Battery energy storage unit
60MW / 120MWh
New Build Generating CMU comprising of battery storage and associated plant.
New Build Generating CMU comprising of battery storage and associated plant.
New Build CMU comprising of battery storage and associated plant