Capacity Market Search

Showing components with technology: Storage (Duration 4h)

Displaying items 1 - 50 of 176 matching components (Page 1 of 4)

Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL

New Build storage facility

GRENERGY RENEWABLES UK LIMITED CMU: GRGF05 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 29.22 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Spring Lane, Gedling, Nottinghamshire, NG4 4PD

New Build Storage Facility

GRENERGY RENEWABLES UK LIMITED CMU: GRSL03 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 37.57 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM10 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_8 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED CMU: 24WBC4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 52.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Coal Aston, Dronfield, S18 3AA

A 45MW Distribution Connected Battery Energy Storage System

ROOT-POWER (SOUTH) LIMITED CMU: DYCH28 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 18.78 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_1 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_6 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_7 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED CMU: 24TM_9 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 58.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED CMU: 24WBC1 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 52.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED CMU: 24WBC2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 52.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED CMU: 24WBC3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 52.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD

New Build Battery Storage Facility

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A 40MW Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ

BESS project to be installed within a future Greener Grid Park.

BALWEN LIMITED CMU: THOR-4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 38.40 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY

BESS project to be installed within a future Greener Grid Park.

STATKRAFT UK LTD CMU: NEIB-4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 230.41 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY

BESS project to be installed within a future Greener Grid Park.

STATKRAFT UK LTD CMU: NEIB-4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 37.98 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Persley Croft, The Parkway, Aberdeen, AB22 8AN

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

PERSLEY CROFT BESS LTD CMU: PCB001 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 19.79 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dounreay, Thurso KW14 7RE

A 34MW Distribution Connected Battery Energy Storage System

REAY POWER LIMITED CMU: REAY28 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 14.19 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Tillingdown Lane, Caterham, CR3 7JA

A 12MW Distribution Connected Battery Energy Storage System

ROOT-POWER (SOUTH) LIMITED CMU: TILL28 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.01 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL

A 50MW Distribution Connected Battery Energy Storage System

ROOT-POWER (NORTH) LIMITED CMU: WADS28 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 20.87 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL

New Build Battery Storage

Buxton Power Limited CMU: BUXTON Storage (Duration 4h) CMU De-Rated N/A CMU DB: 7.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA

New Build Storage Facility

GRENERGY RENEWABLES UK LIMITED CMU: GRFB02 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS

New Build Battery Storage Facility

GRENERGY RENEWABLES UK LIMITED CMU: GRTR06 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.22 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Hollybush BESS Ltd CMU: LANDO1 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 7.93 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE26 Limited CMU: WCSE26 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 61.25 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm, TD12 4LU.

Lithium ion battery storage plant.

ZENOBE ECCLES LIMITED CMU: NBKIS4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS

A Battery Energy Storage System.

PD688IRO LTD CMU: MNT27B Storage (Duration 4h) CMU De-Rated N/A CMU DB: 14.62 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS

A Battery Energy Storage System.

PD688IRO LTD CMU: MNT27A Storage (Duration 4h) CMU De-Rated N/A CMU DB: 14.62 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Adjacent to National Grid Stalybridge substation SK15 3DA.

Lithium ion battery storage plant.

Zenobe Stalybridge Limited CMU: NBBLX1 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU

50MW battery storage located near Coalburn North 400kV substation.

ZENOBE COALBURN LIMITED CMU: NBCOA1 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU

50MW battery storage located near to the Coalburn North 400kV substation.

ZENOBE COALBURN LIMITED CMU: NBCOA2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

50MW battery storage located near to the SPT Eccles substation.

ZENOBE ECCLES LIMITED CMU: NBECL2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

50MW battery storage located near to the SPT Eccles substation.

ZENOBE ECCLES LIMITED CMU: NBECL3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

50MW battery storage located near to the SPT Eccles substation

ZENOBE ECCLES LIMITED CMU: NBECL4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

50MW battery storage located near to the SPT Eccles substation.

ZENOBE ECCLES LIMITED CMU: NBECL5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm, TD12 4LU

Lithium ion battery storage plant

ZENOBE ECCLES LIMITED CMU: NBKIS2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm, TD12 4LU

Lithium ion battery storage plant.

ZENOBE ECCLES LIMITED CMU: NBKIS3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 15.39 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
adjacent to National Grid Stalybridge substation SK15 3DA

75MW battery storage located near to the National Grid Stalybridge substation.

Zenobe Stalybridge Limited CMU: NBSTL2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 23.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction