Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE30 Limited CMU: SCSE30 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 92.03 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE33 Limited CMU: BCSE33 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 122.81 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA

50MW of BESS to be installed within existing Rotating Stabiliser site.

KEITH STORAGE SOLUTIONS LIMITED CMU: KTHB-2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 8.48 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K22244 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 4.59 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K22243 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 4.59 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K22242 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 18.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K22241 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 18.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K12244 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 4.59 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

Lithium ion battery storage plant

ZENOBE BLACKHILLOCK LIMITED CMU: K12243 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 4.59 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K12242 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 18.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

Lithium ion battery storage plant

ZENOBE BLACKHILLOCK LIMITED CMU: K12241 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 18.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)

EGGBOROUGH POWER LIMITED CMU: EBAT15 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 23.39 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)

EGGBOROUGH POWER LIMITED CMU: EBAT15 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 23.39 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)

EGGBOROUGH POWER LIMITED CMU: EBAT15 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 22.93 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Dragons Lane, Moston, Sandbach, CW11 3QH

12 MW Connection 48 MWh Distribution unit

DRAGONS LANE BATTERY STORAGE LIMITED CMU: HY0001 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.50 MW 2026-27 (T-4) Four Year Ahead Capacity Auction