Capacity Market Search

Showing components with technology: Storage (Duration 4h)

Displaying items 101 - 150 of 176 matching components (Page 3 of 4)

East Tarelgin Farm, Ayr, KA6 6NF

18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.

COYLTON ENERGY LIMITED CMU: COYB-2 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 8.48 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US4H54 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 2.58 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US4H53 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 3.88 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US4H21 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 2.58 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ

BESS project to be installed within a future Greener Grid Park.

BALWEN LIMITED CMU: THOR-4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 49.83 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBF24 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 14.01 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K42244 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.42 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K42243 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.42 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K42241 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 21.67 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K32244 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 5.42 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K32242 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 21.67 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Station Rd, Clowne, Chesterfield S43 4AB

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U4 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Hammonds Drive, Eastbourne BN22 8QJ

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Heysham Road, Bootle, L30 6TU

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U3 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED CMU: US4H02 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 2.58 MW 2025-26 (T-1) One Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

Lithium ion battery storage plant

ZENOBE KILMARNOCK SOUTH LIMITED CMU: K42242 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 21.67 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U5 Storage (Duration 4h) CMU De-Rated N/A CMU DB: 0.11 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

CIRENCESTER SOLAR FARM LTD CMU: GSCIRE Storage (Duration 4h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U2 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U2 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U1 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Stephenson Road, Colchester Business Park, CO4 9QP

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U1 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Tabor Avenue Reservoir, CM7 1FB

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U1 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U2 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U2 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED CMU: BBT1U2 Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

CIRENCESTER SOLAR FARM LTD CMU: GSCIRE Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Waterswallows Energy Limited CMU: WATERS Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Waterswallows Energy Limited CMU: WATERS Storage (Duration 4h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction