Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

14 unique locations - 14.0MW total capacity

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
70.00 MW
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
42.00 MW
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.48 MW
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
42.00 MW
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
42.00 MW
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan SA13 2PG (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
42.00 MW
The Mount, Virginia Water, Surrey, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
97.99 MW
Tilbury Freeport Tilbury Essex RM18 7HE (6 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.13 MW
Loading map...
Showing 10 locations