Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

20 unique locations - 14.0MW total capacity

Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
186.15 MW
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.59 MW
Centro 3, Maxted Close, Hemel Hempstead, Herts, HP2 7SU (6 components)
• DSR Component providing load turn down at a data centre
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
4.32 MW
Christchurch Bournemouth BH23 2JY (2 components)

Water treatment centre

Inactive • 2022-23 (T-3), 2019-20 (T-1)
Christchurch Bournemouth BH23 2JY (3 components)

Water treatment centre

Inactive • 2022-23 (T-3), 2019-20 (T-1)
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (4 components)
• 3 MW of demand reduction
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Inactive • 2022-23 (T-3), 2019-20 (T-1)
Francis Avenue Bournemouth BH11 8NX (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (5 components)
• Aggregate CMU from multiple sources
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
50.90 MW
Loading map...
Showing 10 locations