Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

234 unique locations - 14.0MW total capacity

Wimbourne Bournemouth BH21 5EP (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Water treatment centre
Inactive • 2023-24 (T-4), 2019-20 (T-1)
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (15 components)
• Heysham 2 Power Station CMU 7: [HY2720] T_HEYM27 + (50% x T_HEYM2-D)
• In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodlands Road West Virginia Water Surrey GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
0.92 MW
Yorkshire Water, Huddersfield HD2 1GQ (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2024-25 (T-1)
14.00 MW
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Loading map...
Showing 10 locations