Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

8 unique locations - 14.0MW total capacity

Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.20 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)
• A gas engine CHP site providing hot water to a local district heating network
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
17.14 MW
Lyncastle Road Battery Storage Scheme, Lyncastle Road, Appleton, Warrington, WA4 4RE. (2 components)
• A 2MW Battery Energy Storage System.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-4)
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.57 MW
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (40 components)
• The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.
• This power plant is a series of modular integrated energy storage rack with batteries which serve as easily configurable building blocks. These racks are organized into individually managed GBS Zone subsystems which are able to be installed in standard ISO containers or in customized enclosures. There is an integrated control architecture with local user interface per battery zone, Integrated air conditioning units, fire detection and suppression system and an auxillary power distribution panel. There is an embedded DC isolation switch (per zone) with safety interlock management system. There is extensive fusing and protections at multiple levels of the system.
• West Burton A Power Station CMU 4 WA4-17= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1598.80 MW
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Loading map...
Showing 8 locations