Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)
• Component has yet to be procured.
• Water treatment centre
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (6 components)
• EV charging at residential premises
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.46 MW
BRISTOL WASTE WATER TREATMENT WORKS, KINGS WESTON LANE, BRISTOL, BS11 0YS (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
Broadstone drive Hampton Water PETERBOROUGH PE7 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
BUDOCK WATER FALMOUTH CORNWALL TR11 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
153.99 MW
Bures WTW, Bures Water Treatment Works, Colchester Road, BURES Suffolk, CO8 5BB, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Burgess Way Manchester Lancashire M28 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (29 components)
• 1 x OCGT
• Commercial printers
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
577.46 MW
BUXTON AVENUE LEIGH-ON-SEA ESSEX SS9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
128.00 MW
Loading map...
Showing 10 locations