Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

50 unique locations - 14.0MW total capacity

Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (4 components)

Glenhove Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (1 component)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (2 components)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (8 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 10 locations