Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

87 unique locations - 14.0MW total capacity

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (4 components)

Crystal glass recycling facility.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (5 components)
• 1.800 MW CHP generation
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
50.00 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
186.15 MW
Bishops Waltham, Botley Road, Bishops Waltham, SO32 1DR (5 components)
• 10 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated land at Bishops Waltham - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Inactive • 2022-23 (T-4)
Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)
• Component has yet to be procured.
• Water treatment centre
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bures WTW, Bures Water Treatment Works, Colchester Road, BURES Suffolk, CO8 5BB, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 10 locations