Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WATERS

301 unique locations - 14.0MW total capacity

Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (5 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.00 MW
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (4 components)

Glenhove Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)
• A gas engine CHP site providing hot water to a local district heating network
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
17.14 MW
Gowanbank TWP Gowanbank Armadale Bathgate (1 component)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (2 components)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Grain Road Isle of Grain Rochester ME3 0AB (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
13.27 MW
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Loading map...
Showing 10 locations