CONRAD ENERGY (DEVELOPMENTS) II LIMITED

6 unique locations (116 components)

Active MW: 1048.04 MW
Inactive MW: 1779.67 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2021-22 (T-4)
Lascar Works, Tanpits Road, Bury, BL9 5BY (15 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Old Littleton Road, Chertsey, TW17 9NU (4 components)
• Battery Storage Facility
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-1), 2021-22 (T-4)
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (7 components)
• N/A
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Active • 2024-25 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 6 locations