Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Westerham Road Sundridge Kent TN14 6ED (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Unit 27A Aber park Aber Road Flint CH6 5EP (17 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (22 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Old Brickyard Brickyard Lane Station Road Verwood Dorset BH31 7LB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Station Road Peterborough Cambs PE7 2EX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Station Road Forest Row RH18 5EN (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Southmoor Lane Havant Hampshire PO9 1JW (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Smithyard Lane, Williton, TA4 4NN (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2023-24 (T-1)
Sloy Power Station, Arrochar, G83 7DP (41 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (54 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Shripney Trade Park, Shripney Road, Bognor Regis, PO22 9GH (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2022-23 (T-1)
Shawhouse Farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (2 components)

10 x 2 MW Gas fuelled engines with connections to the distribution and gas networks. The engines will be sited on a compound at Shawhouse Farm, Clitheroe, BB7 9AD

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (9 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Road off Ffordd William Morgan St Asaph LL17 0JB (2 components)

Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Recycling Centre Meek Street Rochdale OL2 6HL (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (77 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Philip Steet Bristol BS2 0TA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Penamser Road, Porthmadog, Gwnyedd, LL49 9NX (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
Park Farm Hook Street Lydiard Tregoze Wiltshire SN5 3NY (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Pandora Business Park Greengate Middleton Manchester M24 1RU (18 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...