Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CORBY POWER LIMITED

122 unique locations (3124 components) - Page 1 of 5

Active MW: 680.27 MW
Inactive MW: 1799.71 MW
ACORN WAY CORBY NORTHAMPTONSHIRE NN18 (1 component)

EV charging at residential premises

Active • 2023-24 (T-1)
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (5 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
AINTREE ROAD CORBY NORTHANTS NN18 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
AIRFIELD WAY WELDON CORBY NORTHAMPTONSHIRE NN17 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
AIRFIELD WAY, WELDON, CORBY, NORTHAMPTONSHIRE, NN17 (4 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
ALLENDALE ROAD STOCKTON-ON-TEES TS18 (4 components)
• On-Site Generating CMU
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
308.52 MW
ASDA Store, Off Lombard Street NG24 1XG (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Store, Stamfordham Road Westerhope, Newcastle, NE52LD (17 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Barn Main Street West Witton LEYBURN NORTH YORKSHIRE DL8 (4 components)

EV charging at residential premises

Active • 2023-24 (T-1)
BARTLETT CLOSE CORBY NORTHHAMPTONSHIRE NN18 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BB18 (17 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (3 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Berry, Corby BMS Sallow Road, Weldon Industrial Estate, Corby, Northamptonshire, NN17 5JX (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
BH22 (67 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.61 MW
BIRKDALE DRIVE CORBY NORTHAMPTONSHIRE NN17 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BIRKDALE DRIVE, CORBY, NORTHAMPTONSHIRE, NN17 (4 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
BL2 (51 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
265.57 MW
BLAIRGOWRIE ROAD CORBY NORTHAMPTONSHIRE NN17 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BN25 (37 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BRIERY CLOSE GREAT OAKLEY CORBY NORTHAMPTONSHIRE NN18 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BS15 (60 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BS9 (93 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BUTTERCUP CLOSE CORBY NORTHAMPTONSHIRE NN18 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
BWW028, Sperrings Green, Chewton Mendip, Chewton Mendip, BA3 4LN (23 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Loading map...
Showing 25 locations