Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

12 unique locations (430 components)

Active MW: 466.30 MW
Inactive MW: 3157.93 MW
Barrow Mill, Park Road, Barrow in Furness, Cumbria, LA14 4TR (24 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.00 MW
CB10 (25 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CM9 (64 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Flint Mill, Aber Road, Flint, CH6 5EX (24 components)
• DSR Component providing load turn down at a paper product manufacturing site
• DSR component providing load turn-down at a paper product manufacturing site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.33 MW
GU24 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (22 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.00 MW
NR15 (34 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
NR18 (65 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (28 components)
• Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce their power demand when required
• DSR Component providing load turndown at a steel melting facility with electric arc furnaces
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.29 MW
SN4 (39 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
SS9 (62 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (24 components)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.59 MW
Loading map...
Showing 12 locations