222 unique locations (1058 components) - Page 5 of 9

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
James Jones, Lockerbie Sawmill, Stevenscroft, Lockerbie, DG11 2SQ (2 components)

DSR component providing load turn-down at a timber saw mill

Inactive • 2020-21 (T-1)
3.45 MW
Kimberly Clark, Aber Road, Flint, CH6 5EX (5 components)

A paper manufacturing site carrying out load-turn down DSR.

Inactive • 2017-18 (T-1)
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components)

Gas fired reciprocating engine(s)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2022-23 (T-4)
Land adjacent to Leyland National Substation, Braithwaite Road, Lillyhall Industrial Estate, Workington, CA14 4ED (4 components)

7.5 MW power plant comprising a series of gas reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Keithick Estate, PH13 9LZ (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4)
LAND AT NORTH OF HOMEFIELD ROAD ST EDMUNDSBURY CB9 8QU (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
Land at Polhampton Farm, Overton, Basingstoke, RG25 3ED (1 component)

9.5 MWs of reciprocating engine generation connecting into existing 33kV substation

Inactive • 2021-22 (T-4)
Land at Queens Road, Immingham, DN40 1QR (10 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (8 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (5 components)

Battery energy storage unit

Active • 2025-26 (T-4)
Land off Orwell Street, Grimsby, DN31 3HF (4 components)

New reciprocating gensets in acoustic enclosure

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (6 components)

Gas peaking reciprocating engine

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 25 locations