Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

964 unique locations (51664 components) - Page 1 of 39

Active MW: 253.70 MW
Inactive MW: 3370.53 MW
13 - 18 Queen Street, Oxford, OX1 1AB (1 component)

DSR Component providing load turn down at a retail store

Active • 2021-22 (T-4)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (1 component)

Back up generator at a data centre

Active • 2018-19 (T-1)
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Active • 2021-22 (T-4)
3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (5 components)
• Domestic EV
• Import/Export metering with diesel generation at a retail store
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2023-24 (T-4), 2022-23 (T-3) ...
670 Ajax Avenue, Slough, SL1 4BG (5 components)

DSR Component providing load turn down at a data centre

Active • 2023-24 (T-4), 2022-23 (T-3) ...
7 Market Street, Manchester, M1 1WT (3 components)
• Import/Export metering with diesel generation at a retail store (2)
• 1 * 1.7MW diesel reciprocating engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (17 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2023-24 (T-4), 2022-23 (T-1) ...
AB15 (83 components)
• Domestic demand turn down
• Holford Gas Storage DSR
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AB31 (62 components)
• EV charging at residential premises
• Load curtailment from refridgeration
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AB39 (46 components)
• Domestic demand turn down
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AB51 (95 components)
• Domestic demand turn down
• Load curtailment from refridgeration
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.00 MW
AB53 (17 components)
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
ABACOT GROVE HOUGHTON REGIS DUNSTABLE BEDFORDSHIRE LU5 (2 components)
• Domestic EV charger
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2019-20 (T-1)
ABBOT ROAD, BURTON-UPON-TRENT, STAFFORDSHIRE, DE13 (1 component)

A gas engine CHP site providing hot water to a local district heating network

Active • 2026-27 (T-4)
0.01 MW
ABINGDON ROAD STANDLAKE WITNEY OXFORDSHIRE OX29 (2 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• to be confirmed once the CMU components are known
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Ajax Avenue, 670 Ajax Avenue, Slough, SL1 4BG (1 component)

Back up generator at a data centre

Active • 2018-19 (T-1)
AL3 (100 components)
• DSR components shall be assigned prior to the start of the Delivery Year.
• Domestic demand turn down
• Hydro Generation Unit
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AL6 (60 components)
• EV charging at residential premises
• EV charging on residential premises
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Amsterdam Way, Gravesend, DA11 (2 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2017-18 (T-1)
0.07 MW
APPLECROSS DRIVE BURNLEY LANCASHIRE BB10 (2 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2025-26 (T-1), 2021-22 (T-1)
2.00 MW
APPLE TREE CLOSE BIGGLESWADE BEDFORDSHIRE SG18 (1 component)

DSR components to be notified when reconfigured

Inactive • 2017-18 (T-1)
ARCADIAN GARDENS, BENFLEET, ESSEX, SS7 (1 component)

To be confirmed once CMU components are known

Active • 2026-27 (T-4)
1.26 MW
ARKAIG PLACE NEWTON MEARNS GLASGOW LANARKSHIRE G77 (1 component)

Import/Export metering with diesel generation at a retail store

Inactive • 2017-18 (T-1)
0.14 MW
ASH LANE, COLLINGTREE, NORTHAMPTON, NN4 (1 component)

to be confirmed once the CMU components are known

Active • 2026-27 (T-4)
2.59 MW
ASHTON CLOSE RENDLESHAM WOODBRIDGE SUFFOLK IP12 (3 components)
• A gas CHP supplying a manufacturing facility
• Component has yet to be procured.
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2021-22 (T-1) ...
0.58 MW
Loading map...
Showing 25 locations