ECOTRICITY (SMART GRID) LIMITED

1 unique locations (9 components)

Active MW: 25.08 MW
Inactive MW: 14.71 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Inactive β€’