Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

10 unique locations (60 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
3 Nutmeg Ln, London E14 2AX (2 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Asda Boston, Monument Road, Bicker, Lincolnshire PE20 3DJ (6 components)
• A new build 11MW battery storage system
• A new build gas fuelled generating station.
• Great Yarmouth 1 - CCGT MSID: 7111
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• 24.95 MW of Battery Storage located at Waterlooville.
• Load curtailment on site and standby generation
• Load curtailment via standby generation exporting excess
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Asda Straiton, Bush Estate, Penicuik EH26 0QA. (3 components)
• Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.
• Load reduction via on-site standby generation taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Asda West Swindon, Iceland Foods Penzance Drive Swindon Wiltshire SN5 7JF (4 components)
• Gas and/or diesel reciprocating engines.
• Mixture of load reduction and standby generation.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Halfway Industrial Estate, Halfway, Sheffield, S20 3GZ (16 components)
• Load reduction
• New build power station comprised of multiple reciprocating engines.
• The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TH, UK (2 components)
• Load reduction
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Inactive • 2021-22 (T-4)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (4 components)
• Load reduction
• This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (4 components)
• 9.999 MW Battery Storage unit located at Dunblane.
• A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. The battery system will be completely independent in terms of operation, metering, ownership etc to the Biomass Station.
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 10 locations