GSES 1 LIMITED

9 unique locations (91 components)

Active MW: 38.29 MW
Inactive MW: 144.55 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)
• 1.000MW of battery storage located at Staffordshire.
• 40MW of Demand Reduction
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)
• 19.500 MW of battery storage located at Hereford.
• Nantwich Existing Site CHP
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2027-28 (T-4), 2023-24 (T-4) ...
16.44 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (15 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
McCains Wombourne - Site 1, Heath Mill Rd, Wombourne, Wolverhampton WV5 8AE, UK (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Moy Park Anwick, Main St, Anwick Village, Sleaford NG34 9SL, UK (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Moy Park Grantham, Gonerby Rd, Gonerby Hill Foot, Grantham NG31 8HX, UK (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Rotherham, (Aldwarke Works), Aldwarke Lane, Rotherham, South Yorkshire, S60 1DW (4 components)
• Component has yet to be procured.
• Industrial Electricity Demand Reduction resulting in reduced electricity imports
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 9 locations