Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

KEADBY GENERATION LIMITED

22 unique locations (1060 components)

Active MW: 738.00 MW
Inactive MW: 12527.98 MW
AB39 (46 components)
• Domestic demand turn down
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2025-26 (T-1), 2025-26 (T-4) ...
AL5 (127 components)
• Domestic demand turn down
• EV charging at residential premises
• domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Aysgarth Avenue Up Hatherley Cheltenham Gloucestershire GL51 (2 components)

Keadby GT3

Active • 2028-29 (T-4), 2025-26 (T-1)
26.67 MW
B17 (58 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• EV charging at residential premises
• EV charging on residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BA1 (88 components)
• Domestic demand turn down
• EV charging at residential premises
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BA2 (149 components)
• EV charging at residential premises (2)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BA3 (77 components)
• Domestic demand turn down
• EV charging at residential premises
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BB1 (63 components)
• EV charging at residential premises (2)
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BB10 (37 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• EV charging at residential premises
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BH10 (29 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
697.84 MW
BH23 (100 components)
• DSR components shall be assigned prior to the start of the Delivery Year.
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL1 (96 components)
• Domestic demand turn down
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
880.64 MW
BL3 (54 components)
• EV charging at residential premises (2)
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.11 MW
BL4 (27 components)
• Domestic demand turn down
• EV charging at residential premises
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL8 (93 components)
• 1 x hydro turbine & synchronous generator
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Genset 3
Active • 2025-26 (T-1), 2025-26 (T-4) ...
10.11 MW
Knutsford Road Mobberley Knutsford Cheshire WA16 (3 components)
• EV charging on residential premises
• Keadby GT3
• bus depot
Active • 2028-29 (T-4), 2023-24 (T-1) ...
26.67 MW
LOWES CLOSE SPARCELLS SWINDON SN5 (2 components)
• Bus depot site
• Keadby 1 CCGT
Active • 2028-29 (T-4), 2023-24 (T-1)
660.73 MW
660.73 MW
26.67 MW
Not applicable (3 components)

Turn down DSR

Active • 2028-29 (T-4), 2025-26 (T-1)
St. Annes Road Dumfries Dumfriesshire DG2 (2 components)

Keadby GT3

Active • 2028-29 (T-4), 2025-26 (T-1)
26.67 MW
THE GLADE GUIST DEREHAM NR20 (2 components)

Keadby 1 CCGT

Active • 2028-29 (T-4), 2025-26 (T-1)
660.73 MW
Loading map...
Showing 22 locations