Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

26 unique locations (599 components) - Page 1 of 2

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
11 BURSOM ROAD, LEICESTER, LE4 1BS (3 components)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
BA4 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BH12 (14 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BH21 (71 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BH22 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (15 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
BS27 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Emirates Stadium, Hornsey Rd, London, N7 7AJ (24 components)
• Battery located behind-the-meter within football stadium, able to reduce imported electricity and/or export to local network
• Battery system installed at Emirates Stadium
Active • 2024-25 (T-4), 2021-22 (T-1) ...
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (6 components)

1.500MW Demand reduction at Coventry Bus Depot

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Active • 2024-25 (T-4)
G66 (49 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
KT8 (27 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
McGill's Buses, Cochranemill Rd, Johnstone PA5 8PP (3 components)

10 controllable electric vehicle chargers at McGills Johnstone depot

Active • 2024-25 (T-4)
MK10 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Norbord Morayhill Dalcross Inverness IV2 7JQ (8 components)

4MW of demand reduction

Active • 2025-26 (T-4), 2024-25 (T-4) ...
NR8 (37 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
PL14 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
S6 (45 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
SL9 (42 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
SP3 (18 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
SP4 (32 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (17 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations