Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

20 unique locations (170 components)

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
Clowne Rd, Stanfree, Chesterfield, S44 6AG (11 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Emirates Stadium, Hornsey Rd, London, N7 7AJ (24 components)
• Battery located behind-the-meter within football stadium, able to reduce imported electricity and/or export to local network
• Battery system installed at Emirates Stadium
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Ervin Amasteel 11KV connection George Henry Road Tipton West Midlands DY4 7BZ (7 components)

0.4MW demand reduction

Active • 2023-24 (T-4), 2022-23 (T-3) ...
2.59 MW
Ervin Amasteel 33KV connection George Henry Road Tipton West Midlands DY4 7BZ (7 components)

2.6MW of demand reduction

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Ground Floor Rear of 91-93 Sterte Avenue West Poole Dorset BH15 2AL (7 components)

6MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
HC ESS4 LIMITED, RED SCAR BUSINESS PARK, LONGRIDGE ROAD, LONGRIDGE, PRESTON, LANCASHIRE, PR2 5NJ (8 components)

19MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Hill Village, Nadder Lane, South Molton, Devon, EX36 4HP (6 components)

20MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
MOONSHILL QUARRY, STOKE HILL, STOKE ST. MICHAEL, RADSTOCK, BA3 5JU (10 components)
• 0.1MW of demand reduction
• 3MW of DSR
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• 0.261 MW of demand reduction
Active • 2020-21 (T-1), 2020-21 (T-4) ...
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (7 components)

3.750 MW of demand reduction

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (6 components)

10.000MW DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
RUFFORD STORAGE, RUFFORD COLLIERY LANE, RAINSWORTH, MANSFIELD, NOTTINGHAMSHIRE, NG21 0HR (8 components)

6MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
5.17 MW
Seamer Carr Landfill Seamer Scarborough YO12 4QA (6 components)
• 3 MW of DSR
• 3 MW of demand reduction
Active • 2020-21 (T-1), 2020-21 (T-4) ...
2.74 MW
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (12 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Active • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (7 components)

4MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Tinwell Intake, TINWELL INTAKE, Private road off Tinwell Road, (goes to business park) Tinwell, STAMFORD Lincolnshire, PE9 3UD, (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (6 components)

2MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)

4MW of DSR

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 20 locations