Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

87 unique locations (580 components) - Page 1 of 4

Active MW: 393.19 MW
Inactive MW: 784.54 MW
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (6 components)

3 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (4 components)

4 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (4 components)

0.27MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
Barrasford Pumping Station Barrasford Hexham NE46 4AY (12 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Active • 2017-18 (TR), 2019-20 (T-1) ...
Beeches Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)

0.2MW of turn-down

Active • 2018-19 (T-1), 2021-22 (T-4)
Blue House Farm Dalton Back Lane Claxton Billingham Durham TS22 5PW (5 components)

Demand reduction

Active • 2018-19 (T-1), 2021-22 (T-4)
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (5 components)

9.8MW of turn down

Active • 2018-19 (T-1), 2021-22 (T-4)
BREACH FARM, CADLEY LANE, SWADLINCOTE, DERBYSHIRE, DE12 6RJ (6 components)

10 MW demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
Brook Farm PV (DZS653A01) North Bradley Trowbridge Wiltshire BA14 9BT (5 components)

Demand reduction

Active • 2018-19 (T-1), 2021-22 (T-4)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Calgarth PS Old Hall Road Windermere LA23 1JA (5 components)

5 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (4 components)

0.2MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
CHILTERN COLD STORAGE, CHILTERN HOUSE, SHREWSBURY AVENUE, PETERBOROUGH, CAMBRIDGESHIRE, PE2 7LB (4 components)

03MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (11 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Clowne Rd, Stanfree, Chesterfield, S44 6AG (10 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Active • 2018-19 (T-1), 2020-21 (T-1) ...
Commerical Road, Wolverhampton, WV1 3RD (6 components)

5 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
ELECTRICITY SUB STATION AT JUNCTION OF W WOODMAN CLOSE LEIGHTON BUZZARD LU7 3NT (5 components)

6 MW storage battery

Active • 2018-19 (T-1), 2021-22 (T-4)
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (9 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Active • 2017-18 (TR), 2019-20 (T-1) ...
Ervin Amasteel 11KV connection George Henry Road Tipton West Midlands DY4 7BZ (7 components)

0.4MW demand reduction

Active • 2020-21 (T-1), 2022-23 (T-3) ...
2.59 MW
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (8 components)
• 2.6MW of demand reduction
• Turn down CMU
Active • 2017-18 (TR), 2019-20 (T-1) ...
Ervin Amasteel 33KV connection George Henry Road Tipton West Midlands DY4 7BZ (7 components)

2.6MW of demand reduction

Active • 2020-21 (T-1), 2022-23 (T-3) ...
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (6 components)

3 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
FEEDER PILLAR 1 (W9920), BROOKFIELD PARK, MANVERS WAY, WATH-UPON-DEARNE, ROTHERHAM, S63 5DJ (4 components)

2MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
Loading map...
Showing 25 locations