Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

P3P Partners LLP

12 unique locations (78 components)

Active MW: 49.74 MW
Inactive MW: 104.18 MW
Asda Dundee Milton, Milton Of Craigie Longtown Road, Dundee, DD4 7RX (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.60 MW
Asda Dunstable, Court Drive LU5 4JD (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.43 MW
Asda Eastleigh, Bournemouth Road, Chandlers Ford, SO53 3YJ (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Hull Savoy Road, Ings Centre , Hull, HU80TX (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Newton Heath, Old Church Street Newton Heath, Manchester, M40 2JL (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Wolverton, Glyn Square Wolverton, Milton Keynes, MK12 5JQ (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.60 MW
Braes of Doune Wind Farm, Milton of Cambus, Nr Doune,FK16 6HG (3 components)

36-turbine wind farm in Doune with a connection capacity of 74.000 MW

Active • 2028-29 (T-4)
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
• New Build Battery Storage
• New build battery Storage
Active • 2028-29 (T-4)
Verge at Oldbrook Boulevard, Nr Rhodes Place, Milton Keynes, MK6 2LU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Verge by Northfield Drive, Nr Tongwell St, Milton Keynes, MK15 0DQ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Verge off Bradwell Road, Nr Woodward Place Junction, Milton Keynes, MK8 9LG (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
Loading map...
Showing 12 locations