Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PRII ENERGY LIMITED

9 unique locations (22 components)

Active MW: 0.00 MW
Inactive MW: 10.00 MW
BLENHEIM DRIVE KIPPAX LEEDS WEST YORKSHIRE LS25 (2 components)
• EV charge station
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2024-25 (T-1), 2023-24 (T-1)
2.00 MW
BROOKLANDS AVENUE MANCHESTER LANCASHIRE M20 (2 components)
• EV charge station
• Gas-fired CHP. Address: Wyke Lane, Wyke, Bradford BD12 9EJ. Auxiliary Power: Aux power is deducted prior to export metering so no adjustment is required for the CM. Output metered nett of station load - no separate metered auxiliary exists.
Active • 2028-29 (T-4), 2018-19 (T-4)
2.00 MW
LLYS CORRWG RHYDYFELIN PONTYPRIDD MID GLAMORGAN CF37 (1 component)

EV charge station

Active • 2028-29 (T-4)
6.28 MW
MAYFIELD GROVE YORK YO24 (2 components)
• A 6.7MW diesel reciprocating engine connected to this distribution network Brogborough Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN SP 970 401
• EV charge station
Active • 2028-29 (T-4), 2018-19 (T-4)
1.00 MW
MIDDLEGROVE ABINGDON OXFORDSHIRE OX14 (1 component)

EV charge station

Active • 2028-29 (T-4)
474.93 MW
MONKSEATON DRIVE WHITLEY BAY NE26 (2 components)
• Description:One Jenbacher CHP engine with a generation capacity of 3.36 MW; Location:APS Growers Ltd / Branfield Nursery 111 Stockbridge Road, Elloughton, HU15 1HW; OS Grid Reference:SE935282
• EV charge station
Active • 2028-29 (T-4), 2018-19 (T-4)
2.00 MW
Not year available (8 components)

EV charge station

Active • 2028-29 (T-4)
WORDSWORTH AVENUE WHEATLEY HILL DURHAM DH6 (2 components)
• A 6.7MW diesel generating set connected to the distribution network. Brogborough Landfill Site Woburn Road Brogborough Bedfordshire MK43 0TN SP 970 401
• EV charge station
Active • 2028-29 (T-4), 2018-19 (T-4)
1.00 MW
WROSE VIEW SHIPLEY BD18 (2 components)
• Connected Capacity is not based on historic export which is taken from primary settlement metering which is net of auxiliaries
• EV charge station
Active • 2028-29 (T-4), 2018-19 (T-4)
2.00 MW
Loading map...
Showing 9 locations