RWE GENERATION UK PLC

16 unique locations (283 components)

Active MW: 20407.06 MW
Inactive MW: 42306.65 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (21 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• CMU consisting of multiple gas reciprocating engines and alternators
Active • 2028-29 (T-4), 2024-25 (T-4) ...
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (40 components)
• The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.
• This power plant is a series of modular integrated energy storage rack with batteries which serve as easily configurable building blocks. These racks are organized into individually managed GBS Zone subsystems which are able to be installed in standard ISO containers or in customized enclosures. There is an integrated control architecture with local user interface per battery zone, Integrated air conditioning units, fire detection and suppression system and an auxillary power distribution panel. There is an embedded DC isolation switch (per zone) with safety interlock management system. There is extensive fusing and protections at multiple levels of the system.
• West Burton A Power Station CMU 4 WA4-17= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit 1 Junction Lane, Newton-le-Willows, Merseyside, WA12 8DN. (2 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage).
• The batteries are housed in 1 No ISO container with an additional container used to house converters. The batteries will be installed in the containers on-site and the complete battery container positioned ready for connection to the sub-station, testing and commissioning.
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)
• Aux. load separately metered
• Storage facility
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stanstead Abbots Ware Hertfordshire SG12 8JY (2 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Longridge Road, Preston, Lancashire PR2 5NQ (8 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (59 components)
• Keadby 1 CCGT
• Keadby GT3
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
• Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
• Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (37 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (14 components)
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2028-29 (T-4), 2026-27 (T-4) ...
4 Redcote Lane Kirkstall Leeds LS4 2 AL (1 component)

50 MW battery generation system, Leeds.

Inactive • 2021-22 (T-4)
Loading map...