SIMEC USKMOUTH POWER LIMITED

3 unique locations (19 components)

Active MW: 218.60 MW
Inactive MW: 227.62 MW
BURNLEY WHARF, MARINE PARADE, SOUTHAMPTON, SO14 5JP (7 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (3 components)
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
• The CMU is a coal-fired set in the Uskmouth power station. This is one of the 2 active units.
• The CMU is a coal-fired set in the Uskmouth power station. Two units are currently active, and one is mothballed.
Inactive • 2017-18 (T-1)
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (9 components)
• 2MW (1 X 2 MW diesel gensets )
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...