Sembcorp Utilities (UK) Limited

62 unique locations (3294 components) - Page 1 of 3

Active MW: 69.70 MW
Inactive MW: 2468.93 MW
AITKEN CRESCENT FALKIRK FK2 (3 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S18G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. The Auxiliary Load Allocation (reference S18G01 Single Line Diagram document) is such that S18G01 Net Generation = M627 + M652 - M655 - 0.66x(M633-M225)
• Domestic EV charger
• domestic demand turn down
Active • 2028-29 (T-4), 2025-26 (T-4) ...
37.80 MW
BA12 (57 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
BH11 (13 components)
• Domestic demand turn down
• Load curtailment
• Marchwood CCGT
Active • 2025-26 (T-1), 2025-26 (T-4) ...
488.34 MW
CANDLE LANE WOORE CREWE CW3 (2 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Output metered net of Station Load – no separate metered auxiliary exists
Active • 2028-29 (T-4), 2018-19 (T-4)
38.65 MW
COLE CRESCENT, AUGHTON, ORMSKIRK, LANCASHIRE, L39 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
Component has yet to be procured. (38 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.83 MW
COURTWAY CRESCENT CHELLASTON DERBY DE73 (3 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site. Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS NZ572214
• Domestic EV charger
• Turn down component
Active • 2025-26 (T-4), 2019-20 (T-4) ...
19.83 MW
CR2 (112 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CR5 (97 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.87 MW
CW11 (128 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
25.27 MW
DE13 (133 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DT11 (46 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
DT6 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
38.93 MW
EN1 (36 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
HA4 (105 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
HA6 (71 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.83 MW
HANNAH WYND ST QUIVOX AYR KA6 (3 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Domestic EV charger
• Gas CHP on South bank of river Humber providing electricity and industrial steam
Active • 2025-26 (T-4), 2017-18 (T-1)
HU17 (99 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
KA5 (16 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
KEMSLEY DRIVE LEIGHTON BUZZARD LU7 (3 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S18G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. The Auxiliary Load Allocation (reference S18G01 Single Line Diagram document) is such that S18G01 Net Generation = M627 + M652 - M655 - 0.66x(M633-M225)
• Domestic EV charger
• Reciprocating genset
Active • 2025-26 (T-1), 2018-19 (T-4)
37.80 MW
L40 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
11.58 MW
LA1 (78 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (5 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS NZ572214
• Domestic EV charger
• The CMU Component reduces import demand by turning off equipment and other non-essential loads. BWW027, Rowberrow, Rowberrow Booster Station, Brigwater Rd, Star, BS25 1QH ST 442 585
Active • 2025-26 (T-4), 2019-20 (T-4) ...
LE2 (148 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
LISTER WALK MORLEY LEEDS LS27 (2 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
38.65 MW
Loading map...
Showing 25 locations