UNIPER GLOBAL COMMODITIES SE

7 unique locations (183 components)

Active MW: 8505.13 MW
Inactive MW: 12482.30 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
EMR Blaydon, Tynedale Works, Blaydon-on-Tyne, NE21 5RZ (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (15 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
• Water treatment centre
Active • 2026-27 (T-4), 2024-25 (T-1) ...
William Lee - Site 1, Callywhite Lane, Dronfield, S182XU (13 components)
• DSR Component providing load turn down at a data centre
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• on site generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
William Lee - Site 2, Callywhite Lane, Dronfield, S182XU (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 7 locations