UNIPER GLOBAL COMMODITIES SE

18 unique locations (630 components)

Active MW: 5502.13 MW
Inactive MW: 15485.30 MW
TS22 (32 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (4 components)
• Ratcliffe Unit 1 coal-fired unit
• Ratcliffe Unit 2 coal-fired unit
• Ratcliffe Unit 3 coal-fired unit
Inactive • 2020-21 (T-4)
Ratcliffe-on-Soar Nottingham NG11 0EE (106 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (7 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Power Station Road Isle of Grain Rochester ME3 0AR (87 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
NP7 (57 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Nottingham Road Great Britain DE5 3QP (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
LE2 (105 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (93 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
FK9 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
E.ON Cottam Development Centre Power Station Cottam Retford DN22 0TF (1 component)

Cottam Development Centre (CDC) CCGT single unit station

Inactive • 2020-21 (T-4)
E.ON Cottam Development Centre Power Station Cottam Retford DN22 0TF (8 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2020-21 (T-4), 2017-18 (T-1)
Cottam Development Centre Power Station Cottam Retford DN22 0TF (13 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (4 components)
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (46 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Brentfield Road Willesden London NW10 8JP (25 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2023-24 (T-4) ...
111 Brancroft Way Enfield Middlesex EN3 7PL (1 component)

Enfield CCGT Power Station - (one unit station)

Inactive • 2020-21 (T-4)
111 Brancroft Way Enfield Middlesex EN3 7PL (23 components)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...