Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ZENOBE ENERGY LIMITED

19 unique locations (155 components)

Active MW: 769.87 MW
Inactive MW: 334.88 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (12 components)

0.39MW Battery Storage located at Newport Bus depot

Active • 2026-27 (T-4), 2024-25 (T-4) ...
2.29 MW
2 Ford St, Coventry CV1 5WT (6 components)

1.2MW Battery Storage located at National Express Coventry

Inactive • 2022-23 (T-1), 2021-22 (T-1)
37 Wenlock Way, Leicester LE4 9HU (3 components)

bus depot

Inactive • 2023-24 (T-1)
2.07 MW
44-48 E Dock St, Dundee DD1 3JS (9 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.07 MW
Ashgrove Road West, Aberdeen AB16 5UL (17 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hunslet Park Depot, Donisthorpe Street, Leeds, Yorkshire, LS10 1PL (9 components)
• 0.39MW Battery Storage located at Hunslet Park Depot, Leeds
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• New reciprocating gensets in acoustic enclosure
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kingsilver Refinery, Church Lane, Hixon ST18 0PY, United Kingdom (5 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (6 components)
• 1 x hydro turbine & synchronous generator
• New build Open Cycle Gas Turbine plant
• bus depot
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Larkfield Industrial Estate, 99 Earnhill Road, Greenock, PA16 0EQ (5 components)
• 1.9 MW Gas gen ENER-G 1999
• bus depot
Active • 2026-27 (T-4), 2023-24 (T-1) ...
2.07 MW
Montgomery Road, Aberdeen AB24 2YA (17 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Ocado, Bush Industrial Estate, Station Rd, Archway, London, N19 5UN (1 component)

104 controllable electric vehicle chargers at Ocado Tufnell Park

Active • 2024-25 (T-4)
3.50 MW
Park Lane, Preesall, Poulton-le-Flyde, FY6 0LU. (3 components)
• Energy facility comprising of reciprocating engine sets.
• bus depot site
Active • 2025-26 (T-4), 2017-18 (T-1)
Roberts Travel Group, The Limes, Midland Rd, Hugglescote, Coalville LE67 2FX (1 component)

13 controllable electric vehicle chargers at Robert's Coaches

Active • 2024-25 (T-4)
3.50 MW
School Road, Aberdeen AB24 1TU (19 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• bus depot site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sloper Rd, Cardiff CF11 8TB (9 components)
• Bus depot site
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
• bus depot site
Active • 2026-27 (T-4), 2024-25 (T-1) ...
2.07 MW
Stagecoach Guildford, Peasmarsh, Guildford, GU3 1LZ (12 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Genset 2
• New build battery
Active • 2026-27 (T-4), 2023-24 (T-1) ...
2.07 MW
Stewarts Coaches, Headley Park 8, Headley Rd E, Woodley, Reading RG5 4SA (1 component)

4 controllable electric vehicle chargers at Stewart's Coaches

Active • 2024-25 (T-4)
3.50 MW
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (6 components)
• 1.2MW Battery Storage located at National Express Coventry
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yardley Wood Bus Depot, Yardley Wood Rd, Yardley Wood, Birmingham, B14 4BN (14 components)
• 0.52 MW Battery Storage located at National Express Yardley Wood.
• 0.52MW Battery Storage located at National Express Yardley Wood
• 5 MW of demand reduction
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.27 MW
Loading map...
Showing 19 locations