CHP and autogeneration

75 unique locations (1919 components) - Page 1 of 3

Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (18 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (13 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
72.55 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.13 MW
The Ridgeway Enfield, Middlesex EN2 8JL (16 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.05 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.33 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (29 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.79 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.69 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.52 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.62 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (24 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
49.30 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (15 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
Solvay, Trinity St, Oldbury, B69 4LW (14 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.11 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (6 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
10.58 MW
SLOANE COTTAGES CHURCH ROAD SHEDFIELD SOUTHAMPTON SO32 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.06 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (15 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.23 MW
School Road, Aberdeen AB24 1TU (28 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.70 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (26 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.31 MW
Saltend Power Station Saltend Hull HU12 8GA (37 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (2 components)

A gas fuelled Combined heat and Power plant

Active • 2028-29 (T-4), 2027-28 (T-4)
6.12 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (49 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.29 MW
RH16 (87 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
234.34 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (14 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Power Station Road Isle of Grain Rochester ME3 0AR (87 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6556.61 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (24 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.65 MW
Pond Street London NW3 2QG (15 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW