Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

69 unique locations (851 components) - Page 2 of 3

EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (8 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1655.52 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1047.71 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (3 components)

EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1481.25 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (12 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.91 MW
Huntsman Drive, Seal Sands, TS2 1TT (4 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (9 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.38 MW
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (39 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4157.42 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (65 components)
• Connah's Quay PS Unit 1 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1255.11 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
• a new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
738.51 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (9 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Little Barford Power Station Little Barford St Neots PE19 6YT (24 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
673.64 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (12 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.10 MW
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Medway Power Station, Rochester, Medway, ME3 0AG (21 components)

Medway CCGT (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13298.69 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (34 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3478.52 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (61 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 31 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25658.00 MW
Loading map...
Showing 25 locations