Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

49 unique locations (180 components) - Page 1 of 2

Active MW: 229775.30 MW
Inactive MW: 33894.12 MW
Ashland Farm, Beck Lane, Skegby Sutton in Ashfield, NG19 6PG (5 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• New Build gas fuelled generation station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (10 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) CENTRICA BARRY LIMITED Existing Generating CMU Barry Barry +1 more CF64
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (8 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)
Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Corringham, Stanford-le-Hope, Essex, SS17 9LP, UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Deeside Power Station, Weighbridge Road, Zone 4, Deeside Industrial Park, Deeside, Flintshire, CH5 2UL (2 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Combined Cycle Gas Turbine (CCGT) DRAX POWER LIMITED New Build Generating CMU Drax CCGT YO8
Inactive • 2023-24 (T-4)
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Combined Cycle Gas Turbine (CCGT) KEADBY GENERATION LIMITED New Build Generating CMU Keadby 2 Keadby 2 DN17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (6 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Combined Cycle Gas Turbine (CCGT) KEADBY GENERATION LIMITED Existing Generating CMU Keadby 1 and GT3 Keadby 1 and GT3 DN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
King?s Lynn Power Station, Willows Business Park, Saddlebow, Kings Lynn, PE34 3RD (3 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)
Combined Cycle Gas Turbine (CCGT) RWE KL Limited New Build Generating CMU Kings Lynn A Kings Lynn A PE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kings Lynn Power Station, Willows Business Park, Saddlebow, Kings Lynn, PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (10 components)

Combined Cycle Gas Turbine plant (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (10 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Damhead Creek 2 OCGT +1 more ME3
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP1 7DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP18DC) (1 component)

New build Combined Cycle Gas Turbine plant

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Conditional ME3
Inactive • 2022-23 (T-4)
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (3 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 25 locations