Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

144 unique locations (1499 components) - Page 6 of 6

Active MW: 100429.76 MW
Inactive MW: 6087.60 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (10 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

Combined Cycle Gas Turbine (CCGT) CORYTON ENERGY COMPANY, LTD. Existing Generating CMU Coryton Coryton +7 more SS17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)

Open Cycle Gas Turbine (OCGT) GAS GENERATION BURNLEY LIMITED New Build Generating CMU Gas Generation Burnley 2 Gas Generation Burnley 2 +2 more BB12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited New Build Generating CMU Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (2 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Open Cycle Gas Turbine (OCGT) HUTHWAITE SOLAR FARM LIMITED New Build Generating CMU HUT111 HUTHWAITE Not Prequalified DE55
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant (3)

Open Cycle Gas Turbine (OCGT) PINXTON ENERGY LIMITED TY COCH ENERGY LIMITED New Build Generating CMU PIN111 TYC111 Not Prequalified CH8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant (2)
• A new Open Cycle Gas Turbine peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) HIRWAUN POWER LIMITED New Build Generating CMU Hirwaun Power OCGT Hirwaun Power OCGT +2 more CF44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Victory Road, Derby, Derbyshire, DE24 9HX (8 components)

Existing OCGT. (3)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
153.14 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3608.42 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY EXPANSION LIMITED New Build Generating CMU Spalding Energy Expansion Spalding Energy Expansion +1 more PE11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (4 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY COMPANY, LTD. Existing Generating CMU Spalding Spalding +2 more PE11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (1 component)

A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of …

Open Cycle Gas Turbine (OCGT) SPALDING ENERGY EXPANSION LIMITED New Build Generating CMU Spalding Energy Expansion PE11
Inactive • 2019-20 (T-1)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY COMPANY, LTD. Existing Generating CMU Spalding Spalding +3 more PE11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Weston Point CHP, INEOS Salt Works, Mersey View Road, Weston Point, Runcorn, WA7 4HB (10 components)

1 x OCGT (3)

Open Cycle Gas Turbine (OCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Weston Point CHP Weston Point CHP +2 more WA7
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components)

A series of gas generators on an existing site. (3)

Active • 2026-27 (T-4), 2024-25 (T-1) ...
56.94 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. (2)
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Combined Cycle Gas Turbine (CCGT) Willington Power Limited New Build Generating CMU WILLINGTON C CCGT WILLINGTON C CCGT +1 more Not Prequalified DE65
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (25 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 19 locations