Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

44 unique locations (974 components) - Page 1 of 2

Warehouse R Royal Victoria Dock Northside London E16 1BA (11 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (10 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.35 MW
Stoneykirk Road, Stranraer, DG9 7BU (29 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
12.50 MW
Seal Sands, Middlesbrough, TS2 1UB (35 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (35 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (10 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.59 MW
Repton Road, Measham, Swadlincote, DE12 7DT (27 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.06 MW
Porters Way, Hillingdon, Greater London, UB7 9AA (13 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.59 MW
P3P Brigg Lane Limited, Brigg Lane, Camblesforth, Selby, Yorkshire, YO88HD (3 components)

The CMU component will have a connection capacity of 10MW. Gas-fired reciprocating engine will be the technology used. There will be a parasitic load of 160kW.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (13 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (19 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.93 MW
Midland Road, Bath, BA2 3EW (18 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.74 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (32 components)
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (25 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (6 components)

Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
24.30 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (19 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Joslin Avenue, Barnet, London, NW9 5HB (18 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.74 MW
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (23 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
INEOS Nitriles (UK) Limited Seal Sands, P.O. Box 62 Middlesbrough, Cleveland TS2 1UB (7 components)

CHP - Auxillary load behind boundary meter - Location TS2 1UB

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Honiton Road, Cranbrook, Exeter, EX5 2DX (19 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network. A solar PV installation is also installed on site, but is metered seperately to the CHP (see SLD).
• A reciprocating gas engine CHP site providing hot water to a local district heating network. A solar PV installation is also installed on site.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.93 MW
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (12 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.33 MW
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (45 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (10 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...