Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

76 unique locations (716 components) - Page 1 of 4

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components) Geocoding Needed
β€’ 3 x 1.2MW gas CHP in a hospital environment.
β€’ 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
1.99 MW
1 Thane Road West, Nottingham, NG2 3AA (36 components) Geocoding Needed
β€’ One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
β€’ One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
98.44 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (9 components) Geocoding Needed
β€’ District heating implementation of two gas CHP engines with no auxilliary load
β€’ Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX05 FLEX05 +1 more MK9
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
20.78 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components) Geocoding Needed

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
10.44 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components) Geocoding Needed

Gas fired CHP

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
112.83 MW
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (3 components) Geocoding Needed

On-site existing CHP generating unit

Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
4.49 MW
Barrow Man Road Birchington Kent CT7 0AX (11 components) Geocoding Needed
β€’ Two CHP engines in horticultural environment with no auxilliary load
β€’ Two 2.7MW CHP engines. Primary fuel type = Natural Gas
β€’ Two 3.3 MW CHP gas engines. Primary fuel type = Natural Gas
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
29.35 MW
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (2 components) Geocoding Needed

The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.

CHP and autogeneration Combined Heat and Power (CHP) EQUANS BUILDINGS LIMITED New Build Generating CMU Central Manchester Hospital Central Manchester Hospital Conditional M13
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
7.86 MW
Bower Building, University of Glasgow, University Avenue, G12 8QQ (2 components) Geocoding Needed

CHP generator exporting to private wire network at the University of Glasgow.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected G12
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (2 components) Geocoding Needed

CHP exporting to a private wire network in a manufacturing environment.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected SK7
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Chareteris Place Edinburgh EH8 8FN (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Church Manorway, Erith DA8 1DL (36 components) Geocoding Needed

gas-fired CHP unit

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU EGEN22 EGEN22 +5 more DA8
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
59.86 MW
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (3 components) Geocoding Needed

On-site existing CHP generating unit

Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
4.49 MW
Cobden Street, Montrose, Angus, DD10 8EA (9 components) Geocoding Needed

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1B-MT Glaxo Barnard Montrose Ware & Worthing +2 more DD10
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
17.16 MW
Cranbrook CHP, Honiton Road, Cranbrook, Exeter, EX5 2DX (2 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP …

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated EX5
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
2.95 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (32 components) Geocoding Needed
β€’ Steam Driven Turbo Alternator 8G1 6,8 MWe
β€’ Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
β€’ TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
305.66 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (17 components) Geocoding Needed
β€’ Gas Engine
β€’ Gas engine
β€’ Gas turbine generator
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST01 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more B15
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
76.59 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (36 components) Geocoding Needed
β€’ One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
β€’ One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
45.86 MW
Fellside CHP, Sellafield Ltd, Seascale, Cumbria, CA20 1PG, UK (4 components) Geocoding Needed

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
31.07 MW
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (3 components) Geocoding Needed
β€’ CHP generating in NHS hospital. No aux load.
β€’ CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
3.24 MW
George Square Charles St Lane EH8 9AG (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components) Geocoding Needed

On-site existing CHP generating unit

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
25.23 MW
Harmire Road, Barnard Castle, County Durham, DL12 8DT (13 components) Geocoding Needed

On-site existing CHP generating unit

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing +2 more DL12
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
18.20 MW
Haxby Rd, York, YO91 1XY (9 components) Geocoding Needed
β€’ CHP Unit
β€’ Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG77 Nestle +2 more YO91
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
23.90 MW
Loading map...
Showing 25 locations