Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

75 unique locations (1613 components) - Page 1 of 3

100 Montifichet Road, Westfield, Stratford E20 1GR (72 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2024-25 (T-4), 2025-26 (T-1) ...
52.51 MW
1 Thane Road West, Nottingham, NG2 3AA (155 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2022-23 (T-1), 2022-23 (T-4) ...
178.43 MW
2 Samworth Way, Melton Mowbray LE13 1GA (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
13.34 MW
96 Kings Rd, Immingham DN40 1QS (2 components)

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

Active • 2028-29 (T-4)
6.45 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (12 components)
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2023-24 (T-4), 2024-25 (T-4) ...
1.20 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Ashgrove Road West, Aberdeen AB16 5UL (26 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
4.54 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
10.41 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
14.83 MW
Barrow Man Road Birchington Kent CT7 0AX (14 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-4) ...
9.46 MW
Bath CHP, Midland Road, Bath, BA2 3EW (14 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.72 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (18 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2024-25 (T-1), 2025-26 (T-1) ...
28.63 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (4 components)

2025 KW gas fire engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.25 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025kW gas engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.54 MW
267.94 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (3 components)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Active • 2028-29 (T-4)
36.38 MW
Cargill PLC, Trafford Park, M17 1PA (30 components)

Siemens SGT200 Based CHP

Active • 2022-23 (T-3), 2022-23 (T-4) ...
94.67 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (80 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2022-23 (T-4), 2023-24 (T-4) ...
93.80 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.39 MW
Chryston, Moodiesburn, Glasgow G69 0JE (9 components)

On-site Generating CMU.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.85 MW
Drakemyre, Dalry KA24 5JJ (44 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-1) ...
83.08 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2023-24 (T-4), 2024-25 (T-4) ...
382.93 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (44 components)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2024-25 (T-4), 2025-26 (T-1) ...
774.43 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Active • 2025-26 (T-1), 2028-29 (T-4)
1.45 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2024-25 (T-1), 2025-26 (T-1) ...
15.82 MW
Loading map...
Showing 25 locations