Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

52 unique locations (526 components) - Page 1 of 3

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (12 components)

CHP Unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN12 ZGEN12 IP32
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.71 MW
530 London Road, Croydon CR7 7YE (9 components)
• CHP
• Gas fired CHP unit
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Rejected CR7
Active • 2024-25 (T-1), 2023-24 (T-4) ...
2.82 MW
530 London Road, Croydon, CR7 7YE (9 components)
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG69 CR7
Active • 2024-25 (T-1), 2023-24 (T-4) ...
2.82 MW
Cobden Street, Montrose, Angus, DD10 8EA (9 components)

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1B-MT Glaxo Barnard Montrose Ware & Worthing +2 more DD10
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)

3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment

Active • 2024-25 (T-4), 2023-24 (T-4)
Denmark Hill, Brixton, London, SE5 9RS (8 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 EH25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (31 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Energy Center, Ashton Street, Liverpool, L69 3GB (36 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (5 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES2A-ST Glaxo R&D Stevenage, Ware +2 more SG1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (5 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU IMP_CHP IMP_SPX CHP W12
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (7 components)

On-site existing CHP generating unit

Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (13 components)

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing +2 more DL12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Haxby Rd, York, YO91 1XY (9 components) Geocoding Needed
• CHP Unit
• Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG77 Nestle +2 more YO91
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (16 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU20 GCMU20 +3 more OX16
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (6 components)
• CHP Unit
• CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU LeicsNHS LeicsNHS LE1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Leicester Royal Infirmary: Infirmary Square, Leicester, LE1 5WW (6 components)

CHP unit

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Len Wright Salads Ltd, Hazeldene, Taylors Meanygate, Tarleton, Lancashire, PR4 6XB (2 components)

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR4
Active • 2025-26 (T-4), 2023-24 (T-4)
Lhoist UK Ltd Hindlow Buxton SK17 0EL (9 components)
CHP and autogeneration Combined Heat and Power (CHP) Utility I Ltd New Build Generating CMU Lhoist CHP Lhoist Hindlow CHP +2 more SK17
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lhoist UK Ltd, Hindlow, Buxton, SK17 0EL (9 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (14 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations