Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

29 unique locations (873 components) - Page 1 of 2

Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
14.73 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.69 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.83 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
116.23 MW
Saltend Power Station Saltend Hull HU12 8GA (34 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2022-23 (T-4), 2023-24 (T-4) ...
3486.78 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (2 components)

A gas fuelled Combined heat and Power plant

Active • 2027-28 (T-4), 2028-29 (T-4)
6.12 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (49 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2022-23 (T-1), 2023-24 (T-1) ...
40.66 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (10 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2023-24 (T-1), 2024-25 (T-1) ...
13.87 MW
Newton Aycliffe CO Durham DL5 6EA (68 components)
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2024-25 (T-4), 2025-26 (T-4) ...
166.42 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (25 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
Active • 2024-25 (T-1), 2025-26 (T-1) ...
7.80 MW
Montgomery Road, Aberdeen AB24 2YA (28 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6.78 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (24 components)

Nantwich Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
13.78 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (34 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Active • 2025-26 (T-1), 2025-26 (T-4) ...
230.55 MW
15.93 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (24 components)

Hamms Hall - Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
15.64 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
6.84 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (53 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
12.25 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2024-25 (T-1), 2025-26 (T-1) ...
15.82 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (44 components)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2024-25 (T-4), 2025-26 (T-1) ...
774.43 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2023-24 (T-4), 2024-25 (T-4) ...
382.93 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (18 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2024-25 (T-1), 2025-26 (T-1) ...
28.63 MW
Bath CHP, Midland Road, Bath, BA2 3EW (14 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.72 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
14.83 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
10.41 MW
Loading map...
Showing 25 locations