Combined Heat and Power (CHP)

513 unique locations (3442 components) - Page 21 of 21

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (2 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
5.48 MW
Wight Salads, Arreton, Newport, Isle of Wight, PO30 3AR (5 components) Geocoding Needed

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.01 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (3 components)

The CMU is a gas fired CCGT CHP (3)

CHP and autogeneration Combined Heat and Power (CHP) BRITISH SUGAR PLC Existing Generating CMU Wissington CHP Wissington CHP +1 more PE33
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Withyhedge Landfill site, Rudbaxton, Haverfordwest SA62 4DB (1 component) Geocoding Needed

Engine generator sets

CHP and autogeneration Resources Management U.K. Limited New Build Generating CMU RML Engines set1 Rejected SA62
Inactive • 2021-22 (T-4)
2.68 MW
Withyhedge Lanfill, Rudbaxton, Haverfordwest,Pembrokshire Sa62 4DB (1 component)

Engine set

CHP and autogeneration Resources Management U.K. Limited New Build Generating CMU RML Engines set1 Rejected SA62
Inactive • 2021-22 (T-4)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components) Geocoding Needed
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components) Geocoding Needed
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.05 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components) Geocoding Needed
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Loading map...
Showing 13 locations