Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

346 unique locations (5968 components) - Page 3 of 14

British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (47 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Inactive •
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (18 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.133 MW.
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.200 MW and total net power capacity of 2.181 MW
Inactive •
Burnside Mills, Kendal,Cumbria,LA9 6PZ (12 components)

Gas fired CHP unit (3)

Inactive •
267.94 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (3 components)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Active • 2028-29 (T-4)
36.38 MW
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (11 components)

A gas engine CHP site providing hot water to a local district heating network

Inactive •
Cargill PLC, Trafford Park, M17 1PA (30 components)

Siemens SGT200 Based CHP

Active • 2022-23 (T-3), 2022-23 (T-4) ...
94.67 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (80 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2022-23 (T-4), 2023-24 (T-4) ...
93.80 MW
Cargill Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (1 component)

RB211 Gas Turbine based CHP

CARGILL PLC Rejected
Inactive •
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.39 MW
Chareteris Place Edinburgh EH8 8FN (6 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Inactive •
Chryston, Moodiesburn, Glasgow G69 0JE (9 components)

On-site Generating CMU.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.85 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (1 component)

new build on site generating CMU

Inactive •
Loading map...
Showing 25 locations