Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

513 unique locations (3442 components) - Page 4 of 21

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components) Geocoding Needed
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.58 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components) Geocoding Needed
• existing CHP on site.
• existing on site CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
69.98 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components) Geocoding Needed
• existing on site CHP
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
105.77 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components) Geocoding Needed
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.970 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity of 2.155 MW
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Royal Liverpool & Broadgreen Hospitals Royal Liverpool & Broadgreen Hospitals +5 more L14
Active • 2026-27 (T-4), 2025-26 (T-4) ...
35.81 MW
Buckland Gardens, Broadway, Worcestershire WR12 7LY (4 components) Geocoding Needed
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.18 MW
Burnside Mills, Kendal, Cumbria, LA9 6PZ (6 components) Geocoding Needed

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.49 MW
Burnside Mills, Kendal,Cumbria,LA9 6PZ (6 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG52 KPEG52 LA9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.92 MW
Buxton Road, Hindlow, Buxton, SK17 0EL (1 component) Geocoding Needed

Generating unit

Active • 2025-26 (T-4)
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (1 component) Geocoding Needed

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU Not Prequalified LL55
Active • 2028-29 (T-4)
18.19 MW
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (9 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more SE8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.53 MW
Cantley, Norwich NR13 3ST (1 component) Geocoding Needed

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
7.23 MW
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (8 components) Geocoding Needed

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.23 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components) Geocoding Needed
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
102.71 MW
Cargill PLC, Trafford Park, M17 1PA (15 components) Geocoding Needed

Siemens SGT200 Based CHP

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Cargill Manch Generation Cargill Manch Generation +8 more M17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
231.35 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (45 components) Geocoding Needed
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
CHP and autogeneration Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Cargill Manch Generation Cargill Manch Generation +8 more M17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
273.39 MW
Cargill Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (1 component) Geocoding Needed

RB211 Gas Turbine based CHP

Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Rejected L20
Active • 2028-29 (T-4)
27.40 MW
Carlton Forest, Blyth Road, Worksop, S81 0TP (2 components) Geocoding Needed
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
Inactive • 2021-22 (T-4)
16.68 MW
Carr Lane, Leyland , Lancashire, PR25 3UD (2 components)
• 10 gas engines in an energy centre environment, exporting electricity
• 3 gas engines in an energy centre environment, exporting electricity
CHP and autogeneration FLEXITRICITY LIMITED New Build Generating CMU FLEX55 FLEX56 Rejected PR25
Inactive • 2021-22 (T-4)
Carr Lane, Leyland, Lancashire, PR25 3UD (2 components) Geocoding Needed
• 10 gas engines in an energy centre environment, exporting electricity
• 3 gas engines in an energy centre environment, exporting electricity
Inactive • 2021-22 (T-4)
5.40 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (3 components) Geocoding Needed

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.07 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (3 components) Geocoding Needed

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
5.41 MW
Chareteris Place Edinburgh EH8 8FN (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Charter Way, Macclesfield SK10 2NA, United Kingdom (1 component) Geocoding Needed

CHP Unit

Inactive • 2023-24 (T-1)
10.65 MW
Loading map...
Showing 25 locations