Combined Heat and Power (CHP)

404 unique locations (6418 components) - Page 6 of 17

Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (44 components)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Active • 2024-25 (T-4), 2025-26 (T-1) ...
774.43 MW
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

Active • 2025-26 (T-1), 2028-29 (T-4)
1.45 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (32 components)
• The CMU BREH14 consists of two CHP components supplying heat, CO2 and power to the on-site Nursery.
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Inactive •
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2024-25 (T-1), 2025-26 (T-1) ...
15.82 MW
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (7 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive •
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (53 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
12.25 MW
Former Oldchurch Hospital Waterloo Road Romford, Essex RM7 0BE (5 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive •
Foundry Court, Southampton, SO19 9ST (5 components)

A reciprocating gas engine CHP providing hot water to a local heating network.

Inactive •
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (10 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Inactive •
Fulham Riverside Townmead Road Fulham SW6 2SY (9 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive •
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2023-24 (T-1), 2023-24 (T-4) ...
8.90 MW
Gaumont Tower Dalston Square Hackney London E8 3BQ (5 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive •
George Square Charles St Lane EH8 9AG (5 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Inactive •
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (45 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Inactive •
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (19 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive •
Glenfield Hospital, Groby Road, Leicester, LE3 9QP (9 components)
• CHP Unit
• Gas Fired CHP
Inactive •
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (6 components)

A gas engine CHP site providing hot water to a local district heating network

Inactive •
Good Hope Hospital, Rectory Road, Sutton Coldfield, West Midlands, B75 7RR (4 components)

1 x gas engine with a total rated gross power capacity of 1.166 MW.

Inactive •
Great Coates, Grimsby, DN31 2TT (15 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive •
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
6.84 MW
Loading map...
Showing 25 locations